5.5 billion yuan! Negative electrode material project signed!
Category:
Industry News
Author:
Source:
Release time:
2025/11/17
Visits:
Information Summary:
On September 19, at the 2025 Suining International Lithium Battery Industry Conference, Chongqing Lid Energy Technology Co., Ltd. officially signed an agreement to establish a 5,000-ton solid-state battery composite metallic lithium negative electrode material project in the Lithium Battery Industrial Park of Shehong City, Suining, Sichuan Province, with an investment of 5.5 billion yuan. The project will build a comprehensive lithium-metal industry base covering 400 mu in Suining, and its products will find wide applications in fields such as solid-state batteries, controlled nuclear fusion, and aerospace.
On September 19, at the 2025 Suining International Lithium Battery Industry Conference, Chongqing Lid Energy Technology Co., Ltd. officially signed an agreement to establish a 5,000-ton solid-state battery composite metallic lithium negative electrode material project in the Lithium Battery Industrial Park of Shehong City, Suining, Sichuan Province, with an investment of 5.5 billion yuan. The project will build a comprehensive lithium-metal industry base covering 400 mu in Suining, and its products will find wide applications in fields such as solid-state batteries, controlled nuclear fusion, and aerospace.
It is reported that the project employs advanced metal lithium distillation technology and is the first in China to achieve customized blending ratios of battery-grade metallic lithium at a purity level of 99.99%. The investor, Chongqing Lide Energy Technology Co., Ltd., is one of only two companies worldwide that have mastered the technology for producing metallic lithium powder; the other is FMC Lithium.
Currently, Chongqing Lide Energy Technology has established a pilot-scale, small-batch production line with a capacity of 200 tons. Its products have passed third-party authoritative testing and have been included in the supplier access list of C, a leading lithium-ion battery company. In addition, the company is collaborating with the laboratory at Tsinghua University to jointly advance the industrial-scale R&D of metallic lithium and solid-state battery anode materials.
According to the plan, the company will achieve pilot production of a 100-ton-scale intermediate sample by 2025, complete construction of a 400-ton-scale production capacity and begin operations in 2026, reach an 800-ton-scale production capacity and initiate IPO application procedures in 2027, and ultimately achieve commercial operation with a 5,000-ton-scale production capacity by 2030. At that time, annual revenue is expected to reach 5 billion yuan, and net profit is projected to exceed 1 billion yuan.
Keywords:
Jiasheng
Carbon
Previous page